- Human verification approved for all 6 I18N requirements - Portal confirmed rendering correctly in EN/ES/PT - Language switcher, persistence, and AI Employee language response verified - Phase 7 (multilanguage) marked complete in ROADMAP.md Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
124 lines
3.7 KiB
Markdown
124 lines
3.7 KiB
Markdown
---
|
|
phase: 07-multilanguage
|
|
plan: "04"
|
|
subsystem: portal-i18n
|
|
tags:
|
|
- i18n
|
|
- verification
|
|
- multilanguage
|
|
- next-intl
|
|
- portal
|
|
|
|
requires:
|
|
- phase: 07-multilanguage
|
|
provides: complete multilanguage portal implementation (07-01 through 07-03)
|
|
provides:
|
|
- human-verified multilanguage support across all portal pages
|
|
- confirmed language switcher works pre-auth and post-auth
|
|
- confirmed AI Employee language-response behavior validated
|
|
- confirmed language preference persistence across sessions
|
|
affects: []
|
|
|
|
tech-stack:
|
|
added: []
|
|
patterns:
|
|
- Human verification as final gate for translation quality (automated builds cannot verify visual/linguistic correctness)
|
|
|
|
key-files:
|
|
created: []
|
|
modified: []
|
|
|
|
key-decisions:
|
|
- "No code changes required — all 6 I18N requirements met by implementation in plans 07-01 through 07-03"
|
|
|
|
patterns-established:
|
|
- "Verification-only plans produce SUMMARY with no task commits — metadata commit captures the checkpoint approval"
|
|
|
|
requirements-completed:
|
|
- I18N-01
|
|
- I18N-02
|
|
- I18N-03
|
|
- I18N-04
|
|
- I18N-05
|
|
- I18N-06
|
|
|
|
duration: verification
|
|
completed: 2026-03-25
|
|
tasks_completed: 1
|
|
files_modified: 0
|
|
---
|
|
|
|
# Phase 7 Plan 4: Multilanguage Human Verification Summary
|
|
|
|
**All 6 I18N requirements verified by human testing — portal renders correctly in EN/ES/PT, language switcher persists across sessions, and AI Employees respond in the user's selected language.**
|
|
|
|
## Performance
|
|
|
|
- **Duration:** verification (human checkpoint)
|
|
- **Started:** 2026-03-25
|
|
- **Completed:** 2026-03-25
|
|
- **Tasks:** 1 (human-verify checkpoint)
|
|
- **Files modified:** 0
|
|
|
|
## Accomplishments
|
|
|
|
- Human verified portal renders correctly in English, Spanish, and Portuguese (I18N-01)
|
|
- Language switcher confirmed working on login page (pre-auth) and sidebar (post-auth) (I18N-02)
|
|
- Language preference confirmed persisting across sessions via DB + JWT (I18N-02)
|
|
- AI Employee language-response behavior confirmed — agent replies in the user's selected language (I18N-03)
|
|
- Agent templates confirmed displaying translated names and descriptions (I18N-04, I18N-05)
|
|
- Error messages and validation text confirmed localized (I18N-05)
|
|
- messages/en.json, messages/es.json, messages/pt.json structure confirmed extensible — adding a 4th language requires only a new JSON file (I18N-06)
|
|
|
|
## Task Commits
|
|
|
|
This plan contained a single human-verify checkpoint. No code changes were made.
|
|
|
|
1. **Task 1: Verify complete multilanguage implementation** - human-verify checkpoint (approved)
|
|
|
|
**Plan metadata:** (this commit)
|
|
|
|
## Files Created/Modified
|
|
|
|
None — verification-only plan.
|
|
|
|
## Decisions Made
|
|
|
|
None - all implementation was completed in plans 07-01 through 07-03. This plan confirmed correctness through human review.
|
|
|
|
## Deviations from Plan
|
|
|
|
None - plan executed exactly as written.
|
|
|
|
## Issues Encountered
|
|
|
|
None.
|
|
|
|
## User Setup Required
|
|
|
|
None - no external service configuration required.
|
|
|
|
## Next Phase Readiness
|
|
|
|
Phase 7 (multilanguage) is complete. All I18N requirements (I18N-01 through I18N-06) are verified and met.
|
|
|
|
The portal supports English, Spanish, and Portuguese with:
|
|
- Cookie-based locale (no URL routing), persisted to DB and JWT
|
|
- Language switcher on login page and in sidebar
|
|
- Browser locale auto-detection on first visit
|
|
- AI Employee language-response injection via system prompt
|
|
- Locale-aware template API calls
|
|
|
|
No blockers. Project milestone v1.0 is fully complete across all 7 phases.
|
|
|
|
## Self-Check: PASSED
|
|
|
|
- SUMMARY.md created and present on disk
|
|
- All I18N requirements already marked complete in REQUIREMENTS.md
|
|
- ROADMAP.md updated: phase 7 shows 4/4 plans complete, status Complete
|
|
- STATE.md updated: progress 29/29 plans, session recorded
|
|
|
|
---
|
|
*Phase: 07-multilanguage*
|
|
*Completed: 2026-03-25*
|