- Created 06-03-SUMMARY.md for human-verify checkpoint completion - All CHAT requirements (CHAT-01–CHAT-05) confirmed by human review - STATE.md updated: 25/25 plans complete, session recorded - ROADMAP.md updated: Phase 6 marked Complete (3/3 summaries) Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
115 lines
3.5 KiB
Markdown
115 lines
3.5 KiB
Markdown
---
|
|
phase: 06-web-chat
|
|
plan: 03
|
|
subsystem: ui
|
|
tags: [web-chat, verification, rbac, websocket, end-to-end]
|
|
|
|
# Dependency graph
|
|
requires:
|
|
- phase: 06-web-chat
|
|
provides: WebSocket gateway backend (Plan 01) and portal chat UI (Plan 02)
|
|
provides:
|
|
- Human-verified end-to-end web chat feature across all CHAT requirements
|
|
- Confirmed RBAC enforcement: all three roles can chat, scoped to accessible tenants
|
|
- Confirmed conversation history persistence across page navigations
|
|
- Confirmed typing indicator and markdown rendering in live environment
|
|
- Phase 6 complete — web chat feature production-ready
|
|
affects: []
|
|
|
|
# Tech tracking
|
|
tech-stack:
|
|
added: []
|
|
patterns:
|
|
- Human verification gate confirms live integration before phase close
|
|
|
|
key-files:
|
|
created: []
|
|
modified: []
|
|
|
|
key-decisions:
|
|
- "All CHAT requirements (CHAT-01 through CHAT-05) verified by human testing before Phase 6 marked complete"
|
|
|
|
patterns-established:
|
|
- "Checkpoint:human-verify as final gate before phase completion — ensures live environment matches code assertions"
|
|
|
|
requirements-completed:
|
|
- CHAT-01
|
|
- CHAT-02
|
|
- CHAT-03
|
|
- CHAT-04
|
|
- CHAT-05
|
|
|
|
# Metrics
|
|
duration: verification
|
|
completed: 2026-03-25
|
|
---
|
|
|
|
# Phase 6 Plan 03: Web Chat Human Verification Summary
|
|
|
|
**End-to-end web chat verified live: WebSocket messaging, conversation persistence, typing indicators, markdown rendering, and RBAC scoping all confirmed working across all three portal roles.**
|
|
|
|
## Performance
|
|
|
|
- **Duration:** Verification (human-gated checkpoint)
|
|
- **Started:** 2026-03-25
|
|
- **Completed:** 2026-03-25
|
|
- **Tasks:** 1 (human-verify checkpoint)
|
|
- **Files modified:** 0
|
|
|
|
## Accomplishments
|
|
|
|
- Human reviewer confirmed all 5 test scenarios from the verification checklist
|
|
- End-to-end flow verified: user sends message via WebSocket, receives LLM response
|
|
- Conversation history confirmed to persist and reload correctly on page revisit
|
|
- Typing indicator confirmed visible during response generation
|
|
- Markdown rendering confirmed correct in agent responses (bold, lists, code blocks)
|
|
- RBAC confirmed: customer_operator can chat but admin-only nav items remain hidden
|
|
- Platform admin confirmed able to chat with agents across tenants
|
|
|
|
## Task Commits
|
|
|
|
This plan contained a single human-verify checkpoint task — no code changes were required.
|
|
|
|
**Plan metadata:** (docs commit — see final_commit below)
|
|
|
|
## Files Created/Modified
|
|
|
|
None — this plan is a verification gate only. All implementation was completed in Plans 01 and 02.
|
|
|
|
## Decisions Made
|
|
|
|
All CHAT requirements (CHAT-01 through CHAT-05) verified by live human testing before Phase 6 marked complete. No deviations from the plan were needed.
|
|
|
|
## Deviations from Plan
|
|
|
|
None — plan executed exactly as written. Human reviewer approved all verification scenarios.
|
|
|
|
## Issues Encountered
|
|
|
|
None.
|
|
|
|
## User Setup Required
|
|
|
|
None - no external service configuration required.
|
|
|
|
## Next Phase Readiness
|
|
|
|
Phase 6 is complete. The web chat feature is production-ready:
|
|
- WebSocket-based real-time chat integrated with the full agent pipeline
|
|
- Conversation history persisted in PostgreSQL
|
|
- Markdown rendering and typing indicators fully functional
|
|
- RBAC enforced across all three roles (platform_admin, customer_admin, customer_operator)
|
|
|
|
No blockers. Phase 6 is the final planned phase — v1.0 feature set is complete.
|
|
|
|
## Self-Check: PASSED
|
|
|
|
- `06-03-SUMMARY.md` — FOUND
|
|
- STATE.md updated (progress recalculated: 25/25, 100%)
|
|
- ROADMAP.md updated (Phase 6 marked Complete, 3/3 summaries)
|
|
- Metrics recorded for phase 06-web-chat plan 03
|
|
|
|
---
|
|
*Phase: 06-web-chat*
|
|
*Completed: 2026-03-25*
|