- Create 02-03-SUMMARY.md documenting WhatsApp adapter implementation - Update STATE.md: advance progress to 56%, add 4 key decisions, record metrics - Update ROADMAP.md: Phase 2 plan progress updated - Mark CHAN-03, CHAN-04 requirements complete in REQUIREMENTS.md
100 lines
4.6 KiB
Markdown
100 lines
4.6 KiB
Markdown
---
|
|
gsd_state_version: 1.0
|
|
milestone: v1.0
|
|
milestone_name: milestone
|
|
status: planning
|
|
stopped_at: Completed 02-agent-features/02-03-PLAN.md
|
|
last_updated: "2026-03-23T20:44:35.519Z"
|
|
last_activity: 2026-03-23 — Roadmap created, ready for Phase 1 planning
|
|
progress:
|
|
total_phases: 3
|
|
completed_phases: 1
|
|
total_plans: 9
|
|
completed_plans: 5
|
|
percent: 0
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-03-22)
|
|
|
|
**Core value:** An AI employee that works in the channels your team already uses — no new tools to learn, no dashboards to check, just a capable coworker in Slack or WhatsApp.
|
|
**Current focus:** Phase 1 — Foundation
|
|
|
|
## Current Position
|
|
|
|
Phase: 1 of 3 (Foundation)
|
|
Plan: 0 of 3 in current phase
|
|
Status: Ready to plan
|
|
Last activity: 2026-03-23 — Roadmap created, ready for Phase 1 planning
|
|
|
|
Progress: [░░░░░░░░░░] 0%
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity:**
|
|
- Total plans completed: 0
|
|
- Average duration: —
|
|
- Total execution time: —
|
|
|
|
**By Phase:**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| - | - | - | - |
|
|
|
|
**Recent Trend:**
|
|
- Last 5 plans: —
|
|
- Trend: —
|
|
|
|
*Updated after each plan completion*
|
|
| Phase 01-foundation P01 | 12 | 2 tasks | 32 files |
|
|
| Phase 01-foundation P02 | 6 | 2 tasks | 15 files |
|
|
| Phase 01-foundation P04 | 19 | 2 tasks | 25 files |
|
|
| Phase 01-foundation P03 | 9 | 2 tasks | 20 files |
|
|
| Phase 02-agent-features P03 | 7 | 2 tasks | 7 files |
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
- [Roadmap]: Coarse 3-phase structure — Foundation → Agent Features → Operator Experience
|
|
- [Roadmap]: Phase 3 portal gated on Phase 2 completing (DB schema stability after memory + tool data models)
|
|
- [Roadmap]: WhatsApp Business Verification must be initiated during Phase 1 (1-6 week approval, WhatsApp goes live in Phase 2)
|
|
- [Phase 01-foundation]: PostgreSQL RLS with FORCE ROW LEVEL SECURITY chosen for tenant isolation; app connects as konstruct_app role (not superuser)
|
|
- [Phase 01-foundation]: SET LOCAL app.current_tenant uses UUID-sanitized f-string (not parameterized) — asyncpg does not support prepared statement placeholders for SET LOCAL
|
|
- [Phase 01-foundation]: channel_type stored as TEXT with CHECK constraint — native sa.Enum caused duplicate CREATE TYPE DDL in Alembic migrations
|
|
- [Phase 01-foundation]: LiteLLM pinned to ==1.82.5, not latest — September 2025 OOM regression in later versions
|
|
- [Phase 01-foundation]: Celery tasks are always sync def with asyncio.run() — hard architectural constraint, never async def
|
|
- [Phase 01-foundation]: AI transparency clause is unconditional in system prompt — agents must disclose AI identity when directly asked
|
|
- [Phase 01-foundation]: llm-pool port 8004 (consistent with shared/config.py llm_pool_url default, not plan-stated 8002)
|
|
- [Phase 01-foundation]: proxy.ts used instead of middleware.ts — Next.js 16 renamed middleware to proxy
|
|
- [Phase 01-foundation]: standardSchemaResolver used over zodResolver — hookform/resolvers v5 dropped zod subpackage, uses Standard Schema protocol; zod v4 implements Standard Schema
|
|
- [Phase 01-foundation]: Auth.js v5 JWT session strategy chosen — no portal_sessions DB table needed for Phase 1, stateless tokens sufficient
|
|
- [Phase 01-foundation]: Patch at usage site in tests: mock 'gateway.channels.slack.resolve_tenant' not 'router.tenant.resolve_tenant' — Python name binding at import time
|
|
- [Phase 01-foundation]: Celery payload extension: msg.model_dump() | extras dict, pop extras before model_validate in tasks.py to avoid pydantic validation errors on unknown fields
|
|
- [Phase 01-foundation]: Bot token for chat.update loaded from channel_connections.config['bot_token'] in orchestrator task — keeps Slack SDK out of orchestrator package
|
|
- [Phase 02-agent-features]: HMAC uses hmac.new() with hmac.compare_digest for timing-safe WhatsApp signature verification
|
|
- [Phase 02-agent-features]: meta-media://{media_id} placeholder URL at normalization time; actual download in adapter after tenant resolution
|
|
- [Phase 02-agent-features]: WhatsApp thread_id = sender wa_id (WhatsApp has no threading; conversation scope is per phone number)
|
|
- [Phase 02-agent-features]: Always return HTTP 200 to Meta webhooks regardless of processing errors to prevent retry storms
|
|
|
|
### Pending Todos
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
- [Roadmap] LLM-03 (BYO API keys) conflicts between REQUIREMENTS.md (v1) and PROJECT.md (v2 out-of-scope). Resolve before Phase 3 planning.
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-03-23T20:44:35.516Z
|
|
Stopped at: Completed 02-agent-features/02-03-PLAN.md
|
|
Resume file: None
|