Phase 08 Plan 04: Mobile PWA Human Verification Summary
All six MOB requirements confirmed passing on mobile viewports — responsive layout, touch nav, full-screen chat, PWA install, push notifications, and touch interactions all approved by human testing.
Performance
- Duration: Verification (human-verify checkpoint)
- Started: 2026-03-25
- Completed: 2026-03-25
- Tasks: 1
- Files modified: 0
Accomplishments
- Human confirmed all MOB-01 through MOB-06 requirements pass on real mobile viewports
- Verified bottom tab bar navigation with RBAC filtering and More bottom sheet at 320px
- Verified desktop sidebar preserved at 768px+ with no tab bar shown
- Verified full-screen WhatsApp-style chat flow with streaming AI responses on mobile
- Verified PWA manifest, service worker, installability, and Lighthouse PWA score >= 90
- Verified push notifications received and tapping notification deep-links to correct conversation
- Verified no hover-stuck interactions; all tap targets meet 44px minimum dimension
Task Commits
This plan is a human verification checkpoint — no code was written.
- Task 1: Verify all mobile and PWA features — human-approved
Files Created/Modified
None — verification only. All implementation was completed in Plans 08-01, 08-02, and 08-03.
Decisions Made
None — followed plan as specified. Human approved all six MOB requirements without requesting rework.
Deviations from Plan
None — plan executed exactly as written.
Issues Encountered
None.
User Setup Required
None — no external service configuration required for this plan.
Next Phase Readiness
Phase 08 (Mobile PWA) is complete. All 8 phases are now complete:
- 01-foundation: PostgreSQL multi-tenancy, FastAPI services, LiteLLM integration
- 02-agent-features: WhatsApp channel, vector memory, RAG, escalation, audit log
- 03-operator-experience: Stripe billing, usage analytics, onboarding wizard, BYO API keys
- 04-rbac: 3-tier RBAC, invite flow, impersonation, operator restrictions
- 05-employee-design: Agent template library, creation wizard, deploy flow
- 06-web-chat: Real-time WebSocket chat, streaming responses, conversation management
- 07-multilanguage: i18n with next-intl, en/es/pt translations, per-user language preference
- 08-mobile-pwa: Responsive layout, bottom tab bar, mobile chat, PWA manifest, push notifications, offline queue
The platform has reached the v1.0 milestone.
Self-Check: PASSED
- SUMMARY.md: FOUND at .planning/phases/08-mobile-pwa/08-04-SUMMARY.md
- Requirements MOB-01 through MOB-06: already marked complete in REQUIREMENTS.md
- STATE.md: updated (progress, session, decision recorded)
- ROADMAP.md: phase 8 marked Complete (4/4 summaries)
Phase: 08-mobile-pwa Completed: 2026-03-25