08-mobile-pwa 04 ui
mobile
pwa
responsive
touch
push-notifications
service-worker
verification
phase provides
08-01 PWA manifest, service worker with offline caching, K monogram icons, splash screen
phase provides
08-02 Bottom tab bar, MobileMoreSheet, full-screen mobile chat, iOS keyboard handling, RBAC-filtered nav
phase provides
08-03 Push notification pipeline, IndexedDB offline queue, second-visit install prompt, PushPermission component
Human-verified sign-off that all six MOB requirements pass on real device viewports
Confirmed
responsive layout correct at 320px, 768px, 1024px (no horizontal scroll, no overlaps)
Confirmed
bottom tab bar navigation with RBAC filtering and More bottom sheet functional
Confirmed
full-screen WhatsApp-style chat flow with streaming AI responses on mobile
Confirmed
PWA installable with correct manifest, service worker registered, Lighthouse >= 90
Confirmed
push notifications received and deep-link to correct conversation on tap
Confirmed
no hover-stuck interactions, all touch targets >= 44px
Phase 08 complete
added patterns
Human verification checkpoint as final gate for mobile UX — automated tests cannot fully validate touch interactions and PWA install UX
created modified
All six MOB requirements approved by human testing — no rework required
Phase completion gate: human-verify checkpoint before marking mobile/PWA phase complete — touch UX, install flow, and push notifications require real device testing
MOB-01
MOB-02
MOB-03
MOB-04
MOB-05
MOB-06
verification 2026-03-25

Phase 08 Plan 04: Mobile PWA Human Verification Summary

All six MOB requirements confirmed passing on mobile viewports — responsive layout, touch nav, full-screen chat, PWA install, push notifications, and touch interactions all approved by human testing.

Performance

  • Duration: Verification (human-verify checkpoint)
  • Started: 2026-03-25
  • Completed: 2026-03-25
  • Tasks: 1
  • Files modified: 0

Accomplishments

  • Human confirmed all MOB-01 through MOB-06 requirements pass on real mobile viewports
  • Verified bottom tab bar navigation with RBAC filtering and More bottom sheet at 320px
  • Verified desktop sidebar preserved at 768px+ with no tab bar shown
  • Verified full-screen WhatsApp-style chat flow with streaming AI responses on mobile
  • Verified PWA manifest, service worker, installability, and Lighthouse PWA score >= 90
  • Verified push notifications received and tapping notification deep-links to correct conversation
  • Verified no hover-stuck interactions; all tap targets meet 44px minimum dimension

Task Commits

This plan is a human verification checkpoint — no code was written.

  1. Task 1: Verify all mobile and PWA features — human-approved

Files Created/Modified

None — verification only. All implementation was completed in Plans 08-01, 08-02, and 08-03.

Decisions Made

None — followed plan as specified. Human approved all six MOB requirements without requesting rework.

Deviations from Plan

None — plan executed exactly as written.

Issues Encountered

None.

User Setup Required

None — no external service configuration required for this plan.

Next Phase Readiness

Phase 08 (Mobile PWA) is complete. All 8 phases are now complete:

  • 01-foundation: PostgreSQL multi-tenancy, FastAPI services, LiteLLM integration
  • 02-agent-features: WhatsApp channel, vector memory, RAG, escalation, audit log
  • 03-operator-experience: Stripe billing, usage analytics, onboarding wizard, BYO API keys
  • 04-rbac: 3-tier RBAC, invite flow, impersonation, operator restrictions
  • 05-employee-design: Agent template library, creation wizard, deploy flow
  • 06-web-chat: Real-time WebSocket chat, streaming responses, conversation management
  • 07-multilanguage: i18n with next-intl, en/es/pt translations, per-user language preference
  • 08-mobile-pwa: Responsive layout, bottom tab bar, mobile chat, PWA manifest, push notifications, offline queue

The platform has reached the v1.0 milestone.

Self-Check: PASSED

  • SUMMARY.md: FOUND at .planning/phases/08-mobile-pwa/08-04-SUMMARY.md
  • Requirements MOB-01 through MOB-06: already marked complete in REQUIREMENTS.md
  • STATE.md: updated (progress, session, decision recorded)
  • ROADMAP.md: phase 8 marked Complete (4/4 summaries)

Phase: 08-mobile-pwa Completed: 2026-03-25