Files
konstruct/.planning/phases/07-multilanguage/07-04-SUMMARY.md
Adolfo Delorenzo b5709d9549 docs(07-04): complete multilanguage verification plan
- Human verification approved for all 6 I18N requirements
- Portal confirmed rendering correctly in EN/ES/PT
- Language switcher, persistence, and AI Employee language response verified
- Phase 7 (multilanguage) marked complete in ROADMAP.md

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-25 17:06:58 -06:00

3.7 KiB

phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed, tasks_completed, files_modified
phase plan subsystem tags requires provides affects tech-stack key-files key-decisions patterns-established requirements-completed duration completed tasks_completed files_modified
07-multilanguage 04 portal-i18n
i18n
verification
multilanguage
next-intl
portal
phase provides
07-multilanguage complete multilanguage portal implementation (07-01 through 07-03)
human-verified multilanguage support across all portal pages
confirmed language switcher works pre-auth and post-auth
confirmed AI Employee language-response behavior validated
confirmed language preference persistence across sessions
added patterns
Human verification as final gate for translation quality (automated builds cannot verify visual/linguistic correctness)
created modified
No code changes required — all 6 I18N requirements met by implementation in plans 07-01 through 07-03
Verification-only plans produce SUMMARY with no task commits — metadata commit captures the checkpoint approval
I18N-01
I18N-02
I18N-03
I18N-04
I18N-05
I18N-06
verification 2026-03-25 1 0

Phase 7 Plan 4: Multilanguage Human Verification Summary

All 6 I18N requirements verified by human testing — portal renders correctly in EN/ES/PT, language switcher persists across sessions, and AI Employees respond in the user's selected language.

Performance

  • Duration: verification (human checkpoint)
  • Started: 2026-03-25
  • Completed: 2026-03-25
  • Tasks: 1 (human-verify checkpoint)
  • Files modified: 0

Accomplishments

  • Human verified portal renders correctly in English, Spanish, and Portuguese (I18N-01)
  • Language switcher confirmed working on login page (pre-auth) and sidebar (post-auth) (I18N-02)
  • Language preference confirmed persisting across sessions via DB + JWT (I18N-02)
  • AI Employee language-response behavior confirmed — agent replies in the user's selected language (I18N-03)
  • Agent templates confirmed displaying translated names and descriptions (I18N-04, I18N-05)
  • Error messages and validation text confirmed localized (I18N-05)
  • messages/en.json, messages/es.json, messages/pt.json structure confirmed extensible — adding a 4th language requires only a new JSON file (I18N-06)

Task Commits

This plan contained a single human-verify checkpoint. No code changes were made.

  1. Task 1: Verify complete multilanguage implementation - human-verify checkpoint (approved)

Plan metadata: (this commit)

Files Created/Modified

None — verification-only plan.

Decisions Made

None - all implementation was completed in plans 07-01 through 07-03. This plan confirmed correctness through human review.

Deviations from Plan

None - plan executed exactly as written.

Issues Encountered

None.

User Setup Required

None - no external service configuration required.

Next Phase Readiness

Phase 7 (multilanguage) is complete. All I18N requirements (I18N-01 through I18N-06) are verified and met.

The portal supports English, Spanish, and Portuguese with:

  • Cookie-based locale (no URL routing), persisted to DB and JWT
  • Language switcher on login page and in sidebar
  • Browser locale auto-detection on first visit
  • AI Employee language-response injection via system prompt
  • Locale-aware template API calls

No blockers. Project milestone v1.0 is fully complete across all 7 phases.

Self-Check: PASSED

  • SUMMARY.md created and present on disk
  • All I18N requirements already marked complete in REQUIREMENTS.md
  • ROADMAP.md updated: phase 7 shows 4/4 plans complete, status Complete
  • STATE.md updated: progress 29/29 plans, session recorded

Phase: 07-multilanguage Completed: 2026-03-25