docs(08-mobile-pwa-04): complete mobile PWA verification plan — Phase 08 and v1.0 milestone complete
This commit is contained in:
129
.planning/phases/08-mobile-pwa/08-04-SUMMARY.md
Normal file
129
.planning/phases/08-mobile-pwa/08-04-SUMMARY.md
Normal file
@@ -0,0 +1,129 @@
|
||||
---
|
||||
phase: 08-mobile-pwa
|
||||
plan: 04
|
||||
subsystem: ui
|
||||
tags: [mobile, pwa, responsive, touch, push-notifications, service-worker, verification]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 08-01
|
||||
provides: PWA manifest, service worker with offline caching, K monogram icons, splash screen
|
||||
- phase: 08-02
|
||||
provides: Bottom tab bar, MobileMoreSheet, full-screen mobile chat, iOS keyboard handling, RBAC-filtered nav
|
||||
- phase: 08-03
|
||||
provides: Push notification pipeline, IndexedDB offline queue, second-visit install prompt, PushPermission component
|
||||
|
||||
provides:
|
||||
- Human-verified sign-off that all six MOB requirements pass on real device viewports
|
||||
- Confirmed: responsive layout correct at 320px, 768px, 1024px (no horizontal scroll, no overlaps)
|
||||
- Confirmed: bottom tab bar navigation with RBAC filtering and More bottom sheet functional
|
||||
- Confirmed: full-screen WhatsApp-style chat flow with streaming AI responses on mobile
|
||||
- Confirmed: PWA installable with correct manifest, service worker registered, Lighthouse >= 90
|
||||
- Confirmed: push notifications received and deep-link to correct conversation on tap
|
||||
- Confirmed: no hover-stuck interactions, all touch targets >= 44px
|
||||
- Phase 08 complete
|
||||
|
||||
affects: []
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- Human verification checkpoint as final gate for mobile UX — automated tests cannot fully validate touch interactions and PWA install UX
|
||||
|
||||
key-files:
|
||||
created: []
|
||||
modified: []
|
||||
|
||||
key-decisions:
|
||||
- "All six MOB requirements approved by human testing — no rework required"
|
||||
|
||||
patterns-established:
|
||||
- "Phase completion gate: human-verify checkpoint before marking mobile/PWA phase complete — touch UX, install flow, and push notifications require real device testing"
|
||||
|
||||
requirements-completed:
|
||||
- MOB-01
|
||||
- MOB-02
|
||||
- MOB-03
|
||||
- MOB-04
|
||||
- MOB-05
|
||||
- MOB-06
|
||||
|
||||
# Metrics
|
||||
duration: verification
|
||||
completed: 2026-03-25
|
||||
---
|
||||
|
||||
# Phase 08 Plan 04: Mobile PWA Human Verification Summary
|
||||
|
||||
**All six MOB requirements confirmed passing on mobile viewports — responsive layout, touch nav, full-screen chat, PWA install, push notifications, and touch interactions all approved by human testing.**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** Verification (human-verify checkpoint)
|
||||
- **Started:** 2026-03-25
|
||||
- **Completed:** 2026-03-25
|
||||
- **Tasks:** 1
|
||||
- **Files modified:** 0
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Human confirmed all MOB-01 through MOB-06 requirements pass on real mobile viewports
|
||||
- Verified bottom tab bar navigation with RBAC filtering and More bottom sheet at 320px
|
||||
- Verified desktop sidebar preserved at 768px+ with no tab bar shown
|
||||
- Verified full-screen WhatsApp-style chat flow with streaming AI responses on mobile
|
||||
- Verified PWA manifest, service worker, installability, and Lighthouse PWA score >= 90
|
||||
- Verified push notifications received and tapping notification deep-links to correct conversation
|
||||
- Verified no hover-stuck interactions; all tap targets meet 44px minimum dimension
|
||||
|
||||
## Task Commits
|
||||
|
||||
This plan is a human verification checkpoint — no code was written.
|
||||
|
||||
1. **Task 1: Verify all mobile and PWA features** — human-approved
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
None — verification only. All implementation was completed in Plans 08-01, 08-02, and 08-03.
|
||||
|
||||
## Decisions Made
|
||||
|
||||
None — followed plan as specified. Human approved all six MOB requirements without requesting rework.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None — plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None — no external service configuration required for this plan.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
Phase 08 (Mobile PWA) is complete. All 8 phases are now complete:
|
||||
|
||||
- 01-foundation: PostgreSQL multi-tenancy, FastAPI services, LiteLLM integration
|
||||
- 02-agent-features: WhatsApp channel, vector memory, RAG, escalation, audit log
|
||||
- 03-operator-experience: Stripe billing, usage analytics, onboarding wizard, BYO API keys
|
||||
- 04-rbac: 3-tier RBAC, invite flow, impersonation, operator restrictions
|
||||
- 05-employee-design: Agent template library, creation wizard, deploy flow
|
||||
- 06-web-chat: Real-time WebSocket chat, streaming responses, conversation management
|
||||
- 07-multilanguage: i18n with next-intl, en/es/pt translations, per-user language preference
|
||||
- 08-mobile-pwa: Responsive layout, bottom tab bar, mobile chat, PWA manifest, push notifications, offline queue
|
||||
|
||||
The platform has reached the v1.0 milestone.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- SUMMARY.md: FOUND at .planning/phases/08-mobile-pwa/08-04-SUMMARY.md
|
||||
- Requirements MOB-01 through MOB-06: already marked complete in REQUIREMENTS.md
|
||||
- STATE.md: updated (progress, session, decision recorded)
|
||||
- ROADMAP.md: phase 8 marked Complete (4/4 summaries)
|
||||
|
||||
---
|
||||
*Phase: 08-mobile-pwa*
|
||||
*Completed: 2026-03-25*
|
||||
Reference in New Issue
Block a user